PrintSked
Your whole shop floor, on one screen.
My Sign Shop
Search orders, customers, jobs, products...
✨ AI Assistant
W
Production Floor
Capacity planning, screen room, automatic purchasing, and floor scanning — your whole shop floor.
Capacity
Day Planner
Screen Room
Labor & Costing
Auto-PO
Scan Station
Week of Jul 13
| Machine | Mon Jul 13 | Tue Jul 14 | Wed Jul 15 | Thu Jul 16 | Fri Jul 17 |
|---|---|---|---|---|---|
Roland Eco-Solvent Wide Format · 400 pc/day |
5.8h / 8h |
7h / 8h |
4h / 8h |
2.4h / 8h |
4.8h / 8h |
Flatbed UV Printer Flatbed · 240 pc/day |
3.2h / 8h |
5.2h / 8h |
7.6h / 8h |
1.6h / 8h |
3.6h / 8h |
CNC Router Routing · 96 pc/day |
2h / 8h |
4.4h / 8h |
4.4h / 8h |
6.4h / 8h |
1.2h / 8h |
Laminator Finishing · 640 pc/day |
2.8h / 8h |
4h / 8h |
4.8h / 8h |
3.2h / 8h |
2h / 8h |
Unscheduled Jobs (3) — drag onto a machine/day
Vehicle Wrap — Fleet Van
Storefront Channel Letters
A-Frame Sidewalk Sign
07/13/2026
Maria G.
Press Operator
7h / 9h
Devon R.
Press Operator
5h / 9h
Aisha K.
Embroidery Op
8h / 9h
Sam T.
Finisher
4h / 9h
Machine
8 AM
9 AM
10 AM
11 AM
12 PM
1 PM
2 PM
3 PM
Roland Eco-Solvent
Fleet Van Wrap
Fleet Van Wrap
Yard Signs
Yard Signs
Flatbed UV Printer
Channel Letters
Channel Letters
Channel Letters
CNC Router
Storefront Sign
Storefront Sign
Laminator
A-Frame Sign
A-Frame Sign
Total
24
Available
17
On Press
5
Needs Reclaim
2
Screen Rack — click to cycle status
S001
110
Available
S002
110
Available
S003
110
On Press
S004
110
Available
S005
156
Needs Reclaim
S006
156
Available
S007
156
On Press
S008
156
Available
S009
156
Available
S010
156
Available
S011
200
Needs Reclaim
S012
200
Available
S013
200
On Press
S014
200
Available
S015
200
Available
S016
230
Available
Available
Coated
Burned
On Press
Needs Reclaim
Emulsion
2.5 gal
reorder at 1 gal
Reclaimer
1.8 gal
reorder at 0.5 gal
Haze Remover
0.4 gal
reorder at 0.5 gal
Degreaser
1.2 gal
reorder at 0.5 gal
Labor Cost (active)
$0
Revenue (active)
$0
Projected Profit
$0
| Job | Revenue | Est. Cost | Actual Cost | Variance | Actual Profit |
|---|---|---|---|---|---|
| Vehicle Wrap — Fleet Van | $4,200 | $1,050 | $980 | +$70 | $3,220 |
| 100 Custom Tees — 5K Run | $1,850 | $540 | $610 | -$70 | $1,240 |
| Channel Letters — Storefront | $6,400 | $1,800 | $1,750 | +$50 | $4,650 |
Goods Required by Active Jobs
Blanks/substrate needed minus on-hand inventory, grouped by supplier.
SanMar
Gildan 5000 Tee — Navy, M–XL
100 Custom Tees — 5K Run
Need 84 pc
3M Graphics
IJ180 Wrap Film — Gloss
Vehicle Wrap — Fleet Van
Need 2 rolls
Gemini Inc.
1/2" Acrylic Letter Stock
Channel Letters — Storefront
Need 6 sheets
Scan / Enter Job Ticket
Scan the barcode on a job ticket (or type the ticket #) to advance it to the next stage.
Scan Log
No scans yet.
Active Job Tickets
Click a ticket to simulate a scan.
JOB-10432 · Vehicle Wrap
Riverside Realty
JOB-10429 · 100 Custom Tees
Oakview HS Boosters
JOB-10421 · Channel Letters
Maple & Co.